FVT and day-ahead gas

Indicative commodity path for Fuel Variation Tariff and daily-metered / day-ahead gas over the next 6–12 months

The short version. FVT and day-ahead books sit much closer to wholesale than SBU or MBU. September wholesale is already about 7.6 c/kWh. FVT commodity on a tracker is modelled near wholesale + 0.6 c; the untraded day-ahead residual near wholesale + 0.3 c. Site charge, shrinkage, carbon tax and transmission sit on top. A 12-month strip booked now is a winter-weighted number.

> 750 MWh
FVT typical annual quantity threshold
> 3,750 kWh
FVT typical SPC threshold
7.6 c
Wholesale gas Sep 2026 to date
+0.6 c
FVT tracker adder over wholesale
+0.3 c
Day-ahead residual adder over wholesale
1.29 c
Carbon tax 2026 (1.44 c from 2027)

1. How these two books differ

FVT — Fuel Variation TariffDay-ahead / daily metered
WhoTypically above 750,000 kWh a year and SPC above 3,750 kWh. Factories, large buildings, process heat.Typically monthly spend above ~€6,500. LDM / DM meters. Sites that can trade forward.
CommodityTracks wholesale plus a published fixed-cost adder (transport, swing, approved margin). Historic card range 4.5–6.0 c is stale versus today’s 7.6 c wholesale.You buy month / quarter / season strips. Anything untraded settles at the day-ahead price plus a thin residual adder.
Other linesSite charge on SPC (~€2.23–€3.16 mid-card). Fixed cost ~0.6–0.9 c. Shrinkage. Carbon tax.Transmission and distribution capacity on MDQ / SPC. Shrinkage. Carbon tax. No bundled standing in the unit.
RiskMonthly unit prints the wholesale move. Budget moves with TTF / NBP.You choose how much to fix. Unhedged residual is the winter risk.

Published FVT unit cards of 4.5–6.0 c/kWh were struck when wholesale sat near 4–5 c. They are not a live quote at 7.6 c wholesale. New FVT commodity will print above that card until wholesale eases.


2. Indicative commodity path (c/kWh, ex VAT)

SeriesOct 26Jan 27Jun 2712-m avg
Wholesale (central)7.88.85.26.9
FVT tracker commodity8.49.45.87.5
Day-ahead residual tracker8.19.15.57.2
FVT 12-month strip booked now8.48.48.48.4
Day-ahead 12-month strip booked now8.18.18.18.1
Carbon tax1.291.291.441.37

High band = cold winter plus a further LNG / Gulf shock. Low band = mild winter and restored flows. Carbon, site/capacity and shrinkage are extra.


3. What sits on top of commodity

  • Carbon tax — 1.29 c/kWh until mid-October 2026, then the legislated step toward 1.44 c in 2027 (NGCT moves to €71/t from 14 October 2026).
  • FVT site charge — SPC-linked, typically a few euro per day on published mid-cards. An oversized SPC is a standing tax.
  • FVT fixed-cost adder — transmission and distribution commodity, UK transport, swing and margin. Historic 0.6–0.9 c.
  • Shrinkage — common to all FVT / DM sites, varies monthly.
  • Day-ahead capacity — transmission exit + distribution capacity on MDQ. GNI year runs 1 October. Review SPC on the May–April peak-day read.
  • VAT — applied to the bill; not inside the c/kWh figures.

4. Renewal tactic for these books

Do not treat FVT like an SBU unit-rate hunt. The winning move is a hedge plan: how much of winter 2026/27 is already bought, and at what price, versus the residual that will print day-ahead in January. A 100% 24-month strip at 8.4 c looks cheap versus January 8.8 c wholesale and expensive versus a June 5.2 c central case.

Practical order of work. 1) Confirm FVT vs DM, AQ, SPC and any minimum-capacity floor from a connection agreement. 2) List open forward trades and the unhedged residual by month. 3) Do not break a strip that already covers Q4–Q1. 4) Prefer covering winter in tranches (Oct, Nov, Dec–Feb) over one 36-month lock. 5) Right-size SPC at the next review window.

Contract support

Need this handled? Save ’N Go is a leading broker for contract renewals with all leading providers. If you have a query on these figures, want a matched quote, or need support at renewal, contact us and we will facilitate it. Quotes are matched to GPRN, AQ, SPC and the open hedge book. info@savengo.ie · (01) 919 8840 · savengo.ie


Wholesale monthly averages current at 23 September 2026. TTF near €74/MWh. GNI distribution and transmission tariffs 2025/26. Legislated NGCT schedule. Mid-market FVT structure (commodity, fixed-cost adder, site charge). No supplier is named.

Save ’N Go · Nationwide · Ireland & NI · info@savengo.ie · (01) 919 8840 · savengo.ie. Indicative view as at 24 September 2026. Not a tender or a guarantee of future prices.

All Categories

Get Free Consultations

SPECIAL ADVISORS
Quis autem vel eum iure repreh ende